Subtask 10150 LAM fields for validation
studies in SVP
Responsible: IASA
Partners: IASA, MF, CHMI
Duration: 3 months (T6-T12)
Deliverables:
Definition of the intercomparison protocol and set of selected meteorological
conditions (milestone T0+6), corresponding LAM full volume atmospheric data
archive for validation studies (Milestone T0+12). (D06) (D07)
Document of work (D06) (~450Kb)
Document of work (D07) (~270Kb)
Subtask 10160 Web server facility
Responsible: IASA
Partners: MF, CHMI
Duration: 6 months (T0-T6)
Deliverables: LAM
surface data exchange protocols (Milestone T0+6) (D08)
Document of work (~750Kb)
Subtask 10130 Preparation of LAM for the
Eastern Mediterranean
Responsible: IASA
Duration: 9 months (T0-T9)
Deliverables :
LAM2 model implemented in the eastern Mediterranean area (Milestone T0+9) (D04)
Document of work (~300Kb)
Subtask 10140 NRT LAM forcing dissemination
for TOP forecasts
Responsible: MF
Partners: MF, IASA, CHMI
Duration: 15 months (T9-T24)
Deliverables: NRT
LAM surface data for forecasting (Milestone T0+9) (D05)
Document of work (~430Kb)
Subtask 10120 Preperation of operational LAM
for the Western Mediterranean Sea
Responsible: MF
Duration: 9 months (T0-T9)
Deliverables:
LAM1 implemented in the Western Mediterranean and AGCM2 post- processing procedure at 0.1°
(milestone T0+9) (D02)
Document of work (~64Kb)
Subtask 10125: Preparation of LAM for the Central
Mediterranean Sea for TOP forecasts
Responsible: CHMI
Duration: 9 months (T0-T9)
Deliverables:
merging procedures for central and western Mediterranean LAM1 (milestone T0+9), final LAM1 product at 10
km resolution for the region west of 22 E. (D03)
Document of work (~64Kb)
Subtask 10210. Usage of high-resolution SST in atmospheric model initialisation.
Responsible: IASA
Partners: IASA, UAT
Duration: 9 months (T9-T18)
Deliverables:
Atmospheric simulations with high resolution SST (milestone T0+18). (D09)
Document of work (~4.5Mb)
Subtask 10220 Usage of model predicted SST fields fron the ALERMO model
Responsible: IASA
Participants: IASA, UAT
Duration: T24-T32 (8 months)
Deliverables:
LAM2 simulations with predicted SST (milestone T0+32) (D10)
Document of work (~2.3Mb)
Subtask 10310 Development of sea surface submodels
Responsible: IASA
Participants: IASA, ICOD
Duration: T0-T24 (24 months)
Deliverables:
Studies of atmospheric response with sea surface submodels,
compared with control run (milestone T0+24)
(D11)
Document of work (~2.5Mb)
Subtask 10320 Estimation of the best set of atmospheric fluxes in the
western Mediterranean Sea
Responsible: MF
Duration: T12-T24
Deliverables:
Evaluation of a specific set of surface fluxes and mixed layer heat budgets (milestone T0+24) (D12)
Document of work (~130Kb)
Subtask 10410 Aegean and Levantine region
Responsible: IASA
Duration: T28-T36 (8 months)
Deliverables:
One-month forecasts of the sea surface fluxes for the ALERMO area (milestone T0+36) (D13)
Document of work (~760Kb)
Subtask 10510 Evaluation of the model results produced during the SVP (Basin and shelf areas of various
resolutions).
Responsible: IASA
Partners: IASA, ICOD
Duration: T13-T36 (24 months)
Deliverables:
Skill scores for the various models and their configuration (milestone T0+36) (D16)